For GCs and public agencies
We price milling per FDOT and county pay items, coordinate maintenance of traffic and density testing, and run the mill and the paver as one crew so the schedule is ours to keep.
Milling removes the worn top of the pavement so the new surface goes back at the right height: flush with the gutter, below the door thresholds, and draining where it should.
Overlaying without milling raises the road every time it is paved. Within a few cycles the curb disappears, water ponds against buildings and driveways, and the gutter stops carrying water. Cold milling takes off an exact depth, typically one to two inches for a resurfacing, more where the profile needs correcting, and leaves a textured surface the new asphalt bonds to.
Milling is also how we fix drainage on an existing lot without rebuilding it. Varying the milling depth lets us re-establish slope toward the inlets before the new surface goes down. We do this on municipal resurfacing programs for Palmetto Bay and Miami-Dade, and as a sub to primes on FDOT and county work.
Milled material is hauled off and recycled. On occupied sites we mill and pave the same section the same day so nothing sits open overnight.

Remove the worn surface, tack and pave a new surface course in one sequence.
Mill along the gutter line so the new surface stays below the curb and water runs to the inlets.
Variable-depth milling to restore slope and stop ponding.
Milled transitions at driveways, aprons and existing pavement so there is no lip.
Manholes, valve boxes and inlets adjusted to the new grade.
Milling as a pay item for paving and utility primes, priced per square yard.
We price milling per FDOT and county pay items, coordinate maintenance of traffic and density testing, and run the mill and the paver as one crew so the schedule is ours to keep.
For condo and HOA streets and commercial lots, milling keeps your curbs and drainage working instead of raising the pavement every time. We phase it so residents keep access.
Milling and resurfacing on SW 92nd Avenue for the Village of Palmetto Bay, intersection resurfacing in Miami Beach for AGC Electric, and roughly $975,000 of milling and resurfacing on the West Little River project for MCM.
See the SW 92nd Avenue project
For a standard resurfacing, typically 1 to 2 inches to match the new surface course. Profile correction and failed areas can require more.
Every overlay raises the surface. Eventually the curb, gutters and door thresholds are lost and drainage fails. Milling keeps the finished height where it belongs.
On a typical residential street or lot section, milling and paving happen the same day and it reopens once the asphalt cools.
It is hauled to be recycled into new asphalt or used as base material.
Call, text us photos on WhatsApp, or send the form. Written proposal within 48 hours for most jobs.