For GCs, utilities and agencies
We restore trenches for utility, electrical and drainage primes to county and municipal standards, priced per square yard, with the inspection handled. Sub pricing in 48 hours.
A pothole is the last stage of a problem that started under the asphalt. We fix the base, not just fill the hole, so the patch is still flat next rainy season.
Most asphalt failures in South Florida start with water. It gets in through a crack or a low spot, softens the limerock base, and the next heavy truck pushes the asphalt down into it. Cold patch from a bag fills the hole for a few weeks. A real repair saw-cuts square edges around the failed area, removes the asphalt and the soft base below it, rebuilds and compacts the base, tacks the edges and places hot-mix asphalt rolled flush with the surrounding pavement.
We do this every week restoring roads after our own sewer, water and drainage work for primes like MCM on Miami-Dade Water and Sewer projects, where the county inspects every patch. The same crew and the same standard go into a parking lot pothole or a driveway repair.
If the problem is drainage, we will say so. Patching a spot that holds water just moves the failure a few feet. Because we also build drainage, we can regrade the area or add a catch basin as part of the same repair.

Saw-cut, remove, rebuild base and patch with hot-mix asphalt. No cold patch as a permanent fix.
Failed sections removed down to the subgrade and rebuilt in compacted lifts before paving.
Permanent asphalt restoration over water, sewer and drainage trenches to county and city standards.
Broken edges along curbs and gutters rebuilt so water runs off instead of under.
Root-lifted or sunken areas leveled and repaved for safety and ADA routes.
Washouts and sinkholes made safe quickly, then repaired properly once the cause is fixed.
We restore trenches for utility, electrical and drainage primes to county and municipal standards, priced per square yard, with the inspection handled. Sub pricing in 48 hours.
One pothole or twenty, we come out, mark the failed areas, explain what caused them and give you one written price for the repair.
Roadway base restoration and asphalt repair across the West Little River sewer project for MCM and Miami-Dade Water and Sewer, and restoration after utility work on City of Miami and Doral projects.
See the West Little River project
Usually because the patch went over a wet or soft base, or the edges were never cut and sealed, so water gets back in. A proper repair removes the soft base and seals the joints.
As a temporary fix to make a hole safe until a proper repair, yes. As a permanent repair, no.
If damage is scattered and the rest of the lot is sound, patch. If more than about a quarter of the surface is cracked or patched, milling and resurfacing is usually the better value over time.
Hot-mix patches can usually take traffic once they cool, typically the same day.
Call, text us photos on WhatsApp, or send the form. Written proposal within 48 hours for most jobs.