FL Certified General Contractor CGC1528272 · FDOT Vendor VF841924774001FDOT DBE · Miami-Dade CSBE(786) 531-1565

Driveway contractor in Miami and South Florida: concrete or asphalt

We build both. Concrete and asphalt driveways, including the apron in the right-of-way, the permit, and the drainage fix if your driveway is why the garage floods.

Most driveway contractors in Miami do one material. We run a concrete crew and an asphalt crew, so we will tell you which one fits your property and your budget instead of selling you the one we happen to pour. Concrete costs more up front and lasts longer with less maintenance; asphalt costs less, goes in faster, and handles tree roots and settling better because it flexes. Either way, the driveway only lasts as long as the base under it, and we build the base ourselves.

The part most homeowners do not know: the apron, the section between the sidewalk and the street, sits in the public right-of-way. In Miami-Dade and most Broward cities it needs a permit and an inspection, and it has to match the municipal standard for thickness and slope. We pull that permit on every driveway we build.

If your current driveway sends water toward the house, we grade the new one away from it or add a channel drain at the garage, because we are also a drainage contractor. One price, one crew, one company to call.

New asphalt driveway placed and compacted by Pimentel in Miami Shores

What we do

New concrete driveways

4-inch slabs over compacted limerock for cars, 6-inch reinforced for trucks and RVs, with control joints and a broom or decorative finish.

New asphalt driveways

Limerock base, prime coat and hot-mix asphalt, rolled to the same density we hit on city streets.

Driveway replacement

Removal and haul-off of the old slab or asphalt, base repair, and the new driveway, concrete or asphalt.

Right-of-way aprons & permits

The apron from sidewalk to street, built to municipal standard, with the permit and inspection handled.

Driveway drainage

Channel drains at the garage, regrading, and French drains alongside so the driveway stops flooding the house.

Widening & extensions

Adding a parking pad, a second lane or a turnaround, matched to the existing driveway.

For builders and developers

Spec homes, duplexes, townhome rows and small commercial sites: we price concrete or asphalt driveways, aprons and the parking field together, pull the right-of-way permits, and sequence around your other trades.

For homeowners and HOAs

Send us a photo and the dimensions. We will tell you whether concrete or asphalt makes more sense for your lot, flag any drainage problem we see, and send a written price that includes the apron and the permit.

Where we have done it

Asphalt driveway and alley paving in Miami Shores, concrete driveways and aprons on municipal sidewalk programs for Palmetto Bay and Miami-Dade County, and parking fields for developers at Stadium Towers and Northside Village.

See the Miami Shores paving project
Pimentel concrete crew forming and pouring a sidewalk and apron

Questions we get asked

Concrete or asphalt driveway: which is better in Miami?

Concrete lasts 30 years or more, resists heat and oil stains, and needs almost no maintenance, but costs more and cracks if the base settles or a root lifts it. Asphalt costs roughly a third less, goes in and reopens in a day, and flexes over roots and soft spots, but needs sealcoating every few years and softens in August heat. We install both and will recommend based on your soil, trees, budget and how long you plan to stay.

How much does a new driveway cost in Miami?

It depends on size, whether the old driveway has to come out, the base condition and the material. A standard two-car asphalt driveway is the least expensive option; the same driveway in concrete costs more. Send dimensions and photos for a written number; our calculators will give you the material quantities first.

Do I need a permit for a driveway in Miami-Dade or Broward?

Yes, in nearly every municipality, because the apron is in the public right-of-way. Some cities also require a permit for the private portion. We handle it and schedule the inspection.

How soon can I park on it?

Concrete: keep cars off for 7 days and heavy trucks off for 28. Asphalt: cars the next day, heavy loads after a week, and no sealcoat for 90 days.

Can you fix the flooding at my garage at the same time?

Yes. A channel drain across the garage opening, regrading the new driveway, or a French drain along the edge are all normal parts of a driveway job for us. We are a drainage contractor as well as a paving contractor.

Ready to price it?

Call, text us photos on WhatsApp, or send the form. Written proposal within 48 hours for most jobs.